العربية Try the demo Start now
Home › BOQ items guide

Bill of quantities items guide

A guide to bill of quantities items in Saudi Arabia: 152 items in 60 categories and 12 divisions — wording, measurement, what the unit rate covers and pricing

Site preparation and earthworks

Concrete works

Masonry works

Waterproofing and thermal insulation

Plaster, paint and gypsum works

Flooring and cladding

Doors, windows and aluminium

Metal and steel works

Plumbing and drainage

Electrical works

HVAC and fire fighting

External works and roads

Frequently asked questions

What does an item page contain?

The item as it is worded in a bill of quantities, its unit and method of measurement, what the unit rate covers and what is priced separately, the Saudi Building Code book that governs it, what moves the rate up or down, and the common mistakes in pricing it.

Do the pages show prices?

They show no figure of our own. Where the item’s main material has a price published by the General Authority for Statistics, you will find a link to its page with the Kingdom-wide average and monthly series, under the publisher’s name and date.

How are the items arranged?

In divisions that follow the sequence of work on site: from site preparation and excavation to concrete, masonry, insulation and finishes, then plumbing, electrical, air conditioning and external works. Each division has its categories, and each category its items.

Who is the guide for?

For quantity surveyors, contractors and anyone reviewing quotations: a quick reference to what an item description should carry and what to ask before accepting its rate.

Read also on EtimadCo

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل