Bill of quantities items guide
A guide to bill of quantities items in Saudi Arabia: 152 items in 60 categories and 12 divisions — wording, measurement, what the unit rate covers and pricing
Site preparation and earthworks
Concrete works
Masonry works
Waterproofing and thermal insulation
Plaster, paint and gypsum works
Flooring and cladding
Doors, windows and aluminium
Metal and steel works
Plumbing and drainage
Electrical works
HVAC and fire fighting
External works and roads
Frequently asked questions
What does an item page contain?
The item as it is worded in a bill of quantities, its unit and method of measurement, what the unit rate covers and what is priced separately, the Saudi Building Code book that governs it, what moves the rate up or down, and the common mistakes in pricing it.
Do the pages show prices?
They show no figure of our own. Where the item’s main material has a price published by the General Authority for Statistics, you will find a link to its page with the Kingdom-wide average and monthly series, under the publisher’s name and date.
How are the items arranged?
In divisions that follow the sequence of work on site: from site preparation and excavation to concrete, masonry, insulation and finishes, then plumbing, electrical, air conditioning and external works. Each division has its categories, and each category its items.
Who is the guide for?
For quantity surveyors, contractors and anyone reviewing quotations: a quick reference to what an item description should carry and what to ask before accepting its rate.
Read also on EtimadCo
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل