Foundation waterproofing in the bill of quantities

Foundation waterproofing protects concrete and steel from soil moisture and salts and from groundwater. It has two levels: a cold-applied bituminous coating to footings, column necks and ground beams where the soil is dry and the water table far below, which is damp-proofing and does not resist water pressure; and torch-applied bituminous membranes or other sheets forming a closed tanking under the raft and around basement walls where there is groundwater or a habitable basement. The soil report decides which level is needed.

Where it sits in the bill and what comes before it on site

Foundation waterproofing items appear in the bill after foundation concrete or in the waterproofing section. They are executed after formwork is struck, the concrete cured, its surface dry and defects repaired, and just before backfilling; waterproofing under a raft precedes its reinforcement.

Items in this category

ItemUnit
Bituminous coating to foundationsm²
Bituminous membrane to foundationsm²

What is often left out when pricing it

Frequently asked questions

When is bituminous coating enough and when is a membrane required?

Coating protects concrete buried in dry soil from moisture and salts but does not resist water pressure. A membrane is required where the water table is near the foundations or there is a basement or underground tank. The designer decides from the soil report; the contractor prices the specification, not his habit.

Are membrane laps measured within the waterproofing area?

No. Waterproofing is measured on the net area covered; side and end laps and reinforcing strips at corners are carried in the unit rate. The rolls bought therefore clearly exceed the measured area, and this difference must appear in the rate analysis rather than be discovered at purchase.

Is the underside of isolated footings waterproofed?

With coating, the footing underside is not coated because it is cast on blinding; its top and sides, the column necks and ground beams are. The specification may call for polyethylene sheeting over the blinding before casting. In a closed membrane system the waterproofing runs under the whole raft and joins the wall waterproofing.

Related calculators and terms

Other categories in Waterproofing and thermal insulation

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل