Central air conditioning in the bill of quantities
Central air conditioning serves the building, or large parts of it, from equipment grouped in one place. Packaged rooftop units suit low, wide buildings such as mosques, showrooms and schools and distribute air through galvanised sheet ducts. Variable refrigerant flow suits multi-storey buildings with spaces of varying use, because each space is controlled separately through small copper pipes. Chilled water remains the choice for very large projects. Ducts and air outlets complete the system, and their items are billed separately from the equipment.
Where it sits in the bill and what comes before it on site
Equipment items come first, then ducts and their insulation, then outlets and dampers. Duct hanging starts after formwork is struck and before suspended ceilings; rooftop units are set once bases, roof waterproofing and power supply are ready.
Items in this category
| Item | Unit |
|---|---|
| Packaged rooftop units | No. |
| Variable refrigerant flow system | No. (units) or lump sum (system) |
| Galvanised steel ductwork | m² (or kg) |
| Grilles and diffusers | No. (or lin. m for linear diffusers) |
What is often left out when pricing it
- Crane lifting of units to the roof, with any permits and temporary road closure it needs.
- Flexible connections, vibration isolators and concrete bases or steel frames under the units.
- Duct leakage testing, air balancing and the testing and commissioning report by a specialist.
- Fire dampers where ducts cross fire-rated walls and floors, with their access doors.
Frequently asked questions
Is ductwork measured in square metres or by weight?
Saudi bills commonly measure the duct surface in square metres with the sheet thickness stated; some clients measure in kilograms. Read the preambles to see whether insulation, hangers and joints are included, and whether fittings are taken at their actual area.
How do I compare packaged units with a variable refrigerant flow system when pricing?
Do not compare the equipment price alone. Packaged units add long ducts, insulation, bases and lifting; variable refrigerant flow adds a copper network, branch joints, refrigerant charge and central control. Total all these items for each option, then compare the whole-system cost.
Who carries testing, commissioning and the start of warranty?
The contractor carries them within the equipment rates unless a separate item exists. Most suppliers require first start-up in the presence of their agent for the warranty to begin, so the agent’s visits, air balancing and test reports belong in the rate analysis.
Related calculators and terms