العربية Try the demo Start now
Home › BOQ items guide › Waterproofing and thermal insulation

Waterproofing and thermal insulation in the bill of quantities

5 categories and 12 items

What the division covers

Insulation works protect the building from water and heat: waterproofing of foundations and buried walls against soil moisture and groundwater, waterproofing of roofs, bathrooms and tanks against leakage, thermal insulation of roofs and external walls, and treatment of joints with waterstops and sealants. They are spread over the project’s stages: foundation waterproofing precedes backfilling, wet-area waterproofing precedes tiling, and roof waterproofing follows completion of the frame and parapet. These items are small in value beside the frame, but an error shows after handover and its repair means removing whole finishes, so they deserve precision in reading the specification and in measuring true areas, vertical parts included.

Where it weighs most

This division weighs most in buildings with basements and underground tanks, in coastal and high-groundwater areas, in hospitals and hotels with their many bathrooms, and in cold stores. It is present in every villa and apartment building, since thermal insulation is mandatory and no roof goes without waterproofing.

Foundation waterproofing

Foundation waterproofing protects concrete and steel from soil moisture and salts and from groundwater. It has two levels: a cold-applied bituminous coating to footings, column necks and ground beams where the soil is dry and the water table far below, which is damp-proofing and does not resist water pressure; and torch-applied bituminous membranes or other sheets forming a closed tanking under the raft and around basement walls where there is groundwater or a habitable basement. The soil report decides which level is needed.

Roof waterproofing

Roof waterproofing is a system of layers, not one: a screed to falls leading water to the outlets, then a waterproof membrane, then thermal insulation and a protection layer or tiles. The commonest membrane in Saudi Arabia is torch-applied modified bitumen sheet, for its durability and ease of inspection; liquid polyurethane or acrylic is chosen for roofs with many penetrations and details or when renewing existing waterproofing. The order of layers, inverted or conventional, decides which protects the other from the intense sun.

Wet areas and tanks waterproofing

This category covers waterproofing the floors and walls of bathrooms, kitchens, laundry rooms and balconies, and lining water tanks internally. The commonest wet-area material is a two-component polymer-modified cementitious coating, brushed on in two coats and able to take tiles; liquid polyurethane is used where more flexibility is wanted. Tanks are lined with materials approved for contact with drinking water: a crystalline or flexible cementitious coating, or a solvent-free epoxy coating, chosen by the condition of the concrete and the cracking expected.

Thermal insulation

Thermal insulation reduces heat transfer through the building envelope and is mandatory for new buildings in Saudi Arabia under the energy conservation code. On roofs, extruded polystyrene boards are laid over the waterproof membrane in an inverted roof, or sprayed polyurethane foam is used, bonding directly to the surface and following its irregularities. On walls, insulated block, insulation boards between two leaves, or an external system bonded and covered with reinforced render are used, with columns and beams insulated too. The building’s thermal calculation sets each material’s thickness.

Joints and waterstops

Joints divide into expansion joints, which split the building into parts that move independently; construction joints, formed where a pour stops; and control joints in floors and long walls. Expansion joints are treated with a compressible filler board, flexible sealant and metal covers in the finishes. Joints of water-retaining structures such as tanks and basements receive polyvinyl chloride waterstops embedded in the concrete, or swelling strips bonded to hardened concrete before the next pour. The type is chosen by the joint’s movement and the water pressure.

Other divisions

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل