Foundation concrete in the bill of quantities
Foundation concrete comprises the reinforced elements that carry the building loads to the soil: isolated, combined and strip footings and the raft, with the column necks and the tie beams that link them. Isolated footings are chosen where the soil is good and loads moderate, as in villas; a raft where the soil is weak, footings would nearly touch, or there is a basement and groundwater; and piles where the sound stratum is deep. These elements are usually poured with sulphate-resisting cement and waterproofed on faces touching the soil.
Where it sits in the bill and what comes before it on site
Its items follow blinding and precede superstructure concrete, in construction order: footings or raft, then column necks, then tie beams. Before pouring, the blinding is approved and the axes set out on it, any membrane under the raft laid, and steel and formwork inspected.
Items in this category
| Item | Unit |
|---|---|
| Isolated footings | m³ |
| Raft foundation | m³ |
| Tie beams (ground beams) | m³ (or lin. m by section) |
| Column necks | m³ |
What is often left out when pricing it
- Bitumen paint or waterproofing to faces touching the soil when named in the concrete item with no item of its own.
- Column and wall starter bars in footings and raft, whose length includes the bend inside the foundation and the lap above.
- Chairs carrying the top mat in rafts and thick footings, steel that is consumed but does not appear on the drawings.
- Waterstops at construction joints and where walls meet the raft in structures below the water level.
Frequently asked questions
Does the rate per cubic metre of foundation concrete include the reinforcement?
It differs between bills. Many government and villa bills make the rate per cubic metre include steel and formwork, so the contractor takes the steel ratio of each element from the drawings. Others give steel its own item per tonne and formwork per square metre. Rates are not compared before knowing which method applies.
How is double counting of concrete avoided where column necks meet tie beams?
One rule is applied on every axis: the neck is measured continuous from footing top to tie-beam top, and the tie beam over its clear length between neck faces. The junction is thus counted once, within the neck. Tie-beam intersections are treated alike: one runs through, the other stops at its face.
Apart from quantity, what makes a raft pour cost more than isolated footings?
A continuous pour of large volume, with the several pumps, standby pump and steady supply from more than one plant it needs; night pouring in hot weather; measures to control the temperature of thick concrete; heavy steel chairs; waterstops at construction joints; and the membrane under the raft with its protection layer.
Related calculators and terms
Other categories in Concrete works