Backfilling and compaction in the bill of quantities
Backfilling means refilling the voids around foundations, under ground slabs and behind basement walls with approved soil spread in layers, moistened and compacted to the required degree. Excavated material is used when tests prove it suitable, which is the more economical option, and selected imported soil replaces it when the excavated material is clayey, sabkha or full of rubbish. Soil replacement means removing weak soil below the founding level and placing engineered fill instead, as the soil report recommends.
Where it sits in the bill and what comes before it on site
Its items follow excavation in the earthworks section, but the work is done after footings, column necks and tie beams are poured and waterproofed. Backfilling starts only once the waterproofing is approved, buried works and under-slab services inspected and the fill sample approved.
Items in this category
| Item | Unit |
|---|---|
| Backfilling and compaction in layers | m³ |
| Imported fill and soil replacement | m³ |
What is often left out when pricing it
- The volume difference between loose soil as delivered and the compacted soil paid for in the certificate.
- Water tankers needed to moisten the layers, especially on sites far from a water source.
- The cost of field density tests on every layer and waiting for results before spreading the next.
- Hand compaction with small plate compactors around column necks and between tie beams where rollers cannot enter.
Frequently asked questions
How is the backfill quantity around foundations calculated?
It equals the paid excavation volume less the volume of everything poured or built below the fill level: blinding, footings, column necks and tie beams. Filling under the ground slab up to its underside is added. The result is a compacted in-place volume, not the volume of loose soil delivered.
When does the engineer reject excavated material for backfilling?
He rejects it when it is highly plastic clay, salt-laden sabkha, mixed with construction waste and organic matter, or fails to reach the required compaction in tests. Selected soil must then be brought from outside the site, and the difference is priced under the imported fill item.
Is backfill paid on the volume before or after compaction?
It is paid on the volume after compaction, calculated geometrically from drawings and levels; the number of truckloads delivered is irrelevant. Because soil shrinks when compacted, each paid cubic metre needs a larger amount of loose soil, and that difference is taken in the rate analysis, not in the quantity.
Related calculators and terms
Other categories in Site preparation and earthworks
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل