Landscaping in the bill of quantities

Landscaping brings together planting works and what serves them: lawns in natural or artificial turf, planting of trees, palms and shrubs, and the irrigation network that keeps them alive. Natural turf is chosen from heat- and salt-tolerant varieties and needs agricultural soil, watering and constant maintenance. Artificial turf is chosen where a green look with lower water use is wanted. Irrigation is designed as drip for trees and shrubs and sprinklers for lawns, fed from a dedicated tank and pump or from treated water.

Where it sits in the bill and what comes before it on site

Landscaping items come at the end of the external works section. Work starts after paving, boundary walls and sleeves under paths are finished; the irrigation network is laid and tested before agricultural soil is spread, then trees are planted, then turf.

Items in this category

ItemUnit
Natural turfm²
Artificial turfm²
Irrigation networklump sum (or lin. m for pipes and No. for equipment)
Tree and palm plantingNo.

What is often left out when pricing it

Frequently asked questions

Does the rate per square metre of natural turf include agricultural soil?

It does where the item states the soil thickness and mix, which is the usual case. Where agricultural soil has its own item in cubic metres, the turf rate covers only supply, planting, fertilising and watering until handover. Either way, removal of unsuitable soil beneath is worth a query.

How is the planting maintenance period priced?

Sometimes as a separate monthly item, sometimes within the planting rates. Allow for labour for watering, mowing, fertilising and pest control, replacement of failed plants, and irrigation water if the owner does not provide it. Leaving it out loads the contractor with months of cost after planting ends.

Is an irrigation network priced as a lump sum or by take-off?

In small gardens it is a lump sum with a drawing and equipment schedule; in large projects pipes are taken off in linear metres per diameter and sprinklers, emitters and valves by number. Either way the contractor takes off the network from the drawing, because a lump sum does not excuse any shortfall.

Related calculators and terms

Other categories in External works and roads

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل