Drywall partitions in the bill of quantities
Drywall partitions are non-loadbearing walls made of a frame of galvanised steel studs and tracks, lined on both sides with boards and filled with mineral wool where sound insulation or fire resistance is required. Standard gypsum boards are used in dry spaces, moisture-resistant boards in bathrooms and fire-resistant boards in corridors and around shafts; cement boards are used where the partition is exposed to direct water or is to be tiled. Compared with blockwork they are light, fast to build and easy to run services through.
Where it sits in the bill and what comes before it on site
Drywall partition items come after masonry and plastering or within the interior fit-out section. Setting-out on the floor and the main services above the ceiling come first; the second face is closed only after the services inside the partition are inspected.
Items in this category
| Item | Unit |
|---|---|
| Gypsum board partitions | m² |
| Cement board partitions | m² |
What is often left out when pricing it
- Strengthening of door jambs and heads with doubled studs or timber inserts inside the frame.
- Backing plates or noggings needed for hanging basins, kitchen cabinets, screens and handrails on the partition.
- Extension of the partition above the suspended ceiling up to the slab where fire or sound rating demands it.
- Fire or acoustic sealant at the partition perimeter and around pipe and cable penetrations.
Frequently asked questions
Are drywall partitions measured on one face or on both?
They are measured once by the area of the partition itself, length by height, and the rate covers the frame, boards to both faces and infill. Common errors are doubling the area in the take-off, or forgetting the two faces when analysing board and jointing quantities.
How does pricing differ between a single-layer and a double-layer partition per face?
Two layers per face double the boards, screws and fixing labour, while only the joints of the exposed layer are taped and filled. This build-up is normally required for fire resistance or higher sound insulation, so each partition type is priced as a separate item according to the partition types schedule on the drawings.
When is gypsum board replaced with cement board?
Where the partition is exposed to direct water, as in shower walls, laundry rooms and commercial kitchens, where it will carry heavy tiling, or in semi-external locations exposed to humidity. Cement board is heavier and slower to cut and needs corrosion-resistant screws and closer stud spacing, so its labour exceeds that of gypsum board.
Related calculators and terms
Other categories in Plaster, paint and gypsum works
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.