Plastering in the bill of quantities

Plaster is a coat of cement–sand mortar applied to walls and soffits to level the surface, protect it and prepare it for paint or cladding. Internal work is normally a spatterdash coat followed by an undercoat and a finishing coat, about 15 to 20 mm in total; external render is thicker, with water-resisting additives and mesh where concrete meets blockwork. Gypsum or pre-bagged plasters are used where higher speed and smoothness are required, while site-mixed cement plaster remains the most common in residential buildings.

Where it sits in the bill and what comes before it on site

Plastering items appear in the bill of quantities after masonry and before painting and tiling. Before work starts the blockwork must be complete and cured, electrical boxes, conduits and door frames fixed, and water supply pipes buried in the walls pressure-tested.

Items in this category

ItemUnit
Internal plasterm²
External renderm²

What is often left out when pricing it

Frequently asked questions

Are door and window openings deducted from the plaster area?

The preambles to the bill of quantities set the rule. Saudi contracts commonly use net measurement: openings are deducted in full and the reveals and sills actually plastered are added. Where the bill says small openings are not deducted in exchange for their reveals, apply that in both the take-off and the payment certificates.

Is plaster measured up to the concrete soffit or up to the suspended ceiling?

It is measured as actually executed according to the drawings. In spaces with a suspended ceiling the plaster usually stops a short distance above ceiling level as the specification states, and runs up to the slab only where fire or acoustic separation requires it. Taking the full height in such spaces inflates the quantity.

When is the rough backing coat under ceramic tiles priced as a separate item?

When the bill of quantities separates it from smooth plaster. Plaster behind wall tiles is a rough undercoat without a finishing coat, so its labour is lower than plaster prepared for paint. If the bill combines both types in one item, price it on the weighted average of the two areas after measuring each.

Related calculators and terms

Other categories in Plaster, paint and gypsum works

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل