Precast concrete and tanks in the bill of quantities
This category joins two different kinds of element: precast slabs made in a factory and erected on site by crane, the best known being prestressed hollow-core slabs, which shorten slab construction and need no formwork; and underground concrete tanks cast on site in watertight concrete. Hollow-core is chosen for long spans, regular plans and repetitive projects, and a cast-in-place tank where the plot dictates a shape and capacity that a ready-made tank cannot offer.
Where it sits in the bill and what comes before it on site
Hollow-core slabs appear with the slab items or in a separate precast section, and are erected after the supporting beams or walls are complete and their levels approved. The underground tank appears with the foundations and is built before backfilling and external works.
Items in this category
| Item | Unit |
|---|---|
| Precast hollow-core slabs | m² |
| Underground concrete water tank | m³ (or lump sum for a stated capacity) |
What is often left out when pricing it
- The reinforced concrete topping over hollow-core slabs and grouting of the longitudinal joints between them.
- Access for the crane and long trailers to the site, road permits and the crane’s standing position.
- Internal lining of the tank with a material suitable for drinking water, and the water test before backfilling.
- Sleeves and puddle flanges where pipes pass through the tank walls and base.
Frequently asked questions
Does the hollow-core rate include the topping?
Usually not. The manufacturer’s offer normally covers supplying and erecting the slabs and grouting the longitudinal joints, leaving the topping, its mesh and the concreting of slab ends at the beams to the main contractor under another item. The scope of the offer is checked line by line against the bill description before pricing.
Is an underground tank priced by capacity or by its concrete quantity?
In villa bills it usually appears as a lump sum for a stated capacity; in larger projects its concrete is measured in cubic metres like other items. Either way the contractor takes concrete and steel from the drawings, because capacity indicates only the water stored, not wall and base thickness, excavation or waterproofing.
When is hollow-core more economical than a cast-in-place slab?
Where spans are long, the plan is regular and areas repeat, and where time is tight and the site admits the crane and trailers. It loses its advantage in plans with many offsets and openings, on tight plots inside residential districts, and in small quantities that do not justify transport and erection.
Related calculators and terms
Other categories in Concrete works
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل