العربية Try the demo Start now
Home › BOQ items guide › Doors, windows and aluminium › Glazed facades and metal cladding

Glazed facades and metal cladding in the bill of quantities

The category covers curtain walls and facade cladding with aluminium composite panels. A curtain wall is built as a stick system of mullions and transoms assembled on site, as a unitised system of factory-assembled units, as structural glazing bonded with silicone, or with point fixings. The stick system suits low-rise buildings and limited areas, and the unitised system suits towers for its fast installation and quality control. Cladding is fixed on an aluminium carrier frame and used for showroom fronts, parapets and column casings, and its core must be fire-resistant.

Where it sits in the bill and what comes before it on site

They appear in the facades section after structural works. Before starting, the concrete frame is completed and surveyed, brackets and anchors are fixed, insulation behind the cladding is executed, scaffolding or lifting platforms are made ready, and shop drawings and the mock-up are approved.

Items in this category

ItemUnit
Curtain wallm²
Aluminium composite panel claddingm²

What is often left out when pricing it

Frequently asked questions

How is a curtain wall measured?

It is measured by square metre on the net area of the facade between its outer edges, including vision and spandrel zones, with no deduction for mullions or opening vents. Entrance doors within the facade are counted by number in separate items, and the preambles state whether their area is deducted from the facade.

Is cladding measured on the elevation or on the developed surface?

In principle the exposed surface actually executed is measured, including opening returns, parapet copings and soffits of projections, but many bills measure the elevation only and deem returns included in the rate. The difference is large on facades with many openings, so the method is settled from the preambles before pricing.

Why is the panel core type decisive in pricing cladding?

Because Civil Defense requirements and the Saudi Building Code prohibit panels with a combustible plastic core on building facades and require fire-resistant panels with approved test reports. The fire-resistant panel costs more and takes longer to supply, and pricing the ordinary panel means rejection of the material at submittal.

Related calculators and terms

Other categories in Doors, windows and aluminium

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل