Water supply network in the bill of quantities

The supply network carries cold and hot water from the tank or pump to the fixtures. Common options in Saudi Arabia are heat-fused polypropylene pipes for mains and risers, sleeved PEX pipes with distribution manifolds inside bathrooms and kitchens, and copper or galvanised steel where specified. Polypropylene is chosen where permanent fused joints are wanted, PEX where a continuous run with no buried joints, which can be withdrawn and replaced, is wanted; central or individual heaters are added according to the number of bathrooms and their distance from the source.

Where it sits in the bill and what comes before it on site

Its items appear in the plumbing bill, usually after drainage, split by diameter. Pipework starts once blockwork is complete, the finished floor level is fixed and chases are cut in the walls, and ends with the pressure test before plastering, waterproofing and tiling.

Items in this category

ItemUnit
Polypropylene (PPR) water supply pipeslin. m (or per point in small projects)
PEX water supply pipeslin. m (or per point)
Water heatersNo.

What is often left out when pricing it

Frequently asked questions

Are pipe fittings measured as a separate item or included in the rate per metre?

The custom in Saudi bills of quantities is that the rate per linear metre carries all fittings — elbows, tees, reducers and couplings — unless the preambles state otherwise. Fittings should therefore be counted from the drawings and spread over the metres, especially in bathrooms, where fittings are many and runs are short.

When do I price a supply point by number and when by linear metre?

Pricing per point is common in villas and small projects; the point covers the pipes from the manifold or main line to the fixture outlet with their fittings and stop valve. The linear metre is used for mains and risers and in large projects. Read the description closely so pipes are not counted twice.

What test pressure should I allow for?

The specification sets the test pressure and its duration; normally it is clearly above working pressure and held for a period under the engineer’s observation. For pricing, the point is that testing is staged, for each floor or zone before the pipes are covered, so allow for repeated labour and equipment, not one visit.

Related calculators and terms

Other categories in Plumbing and drainage

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل