Concrete works in the bill of quantities
5 categories and 16 items
What the division covers
Concrete works cover everything poured on site or erected as precast: blinding and the ground slab, then footings, raft, tie beams and column necks, then columns, walls, floor slabs and stairs, with their reinforcement and formwork, and finally tanks and precast slabs. They start once excavation is complete and the founding level approved, and end with the top roof slab pour, after which masonry and finishes begin. In most buildings this is the heaviest division of the bill, so it gets most of the estimator’s care: an exact take-off, a steel ratio taken from the drawings rather than assumed, and a check of ready-mix and steel prices at tender.
Where it weighs most
This division weighs most in residential and commercial towers, hospitals, schools, mosques and multi-storey car parks, and in villas, where owners often contract for the concrete frame alone. It weighs less in warehouses and factories with steel structures, where it is limited to foundations and floors.
Plain concrete
Plain concrete is unreinforced or lightly reinforced concrete that has no main structural role. Its best-known uses are blinding under foundations, which gives a level, clean surface for fixing steel, and the ground slab bearing on compacted soil, usually reinforced with welded mesh to control shrinkage cracks. It is poured at low strength for blinding and medium strength for floors, with sulphate-resisting cement wherever the soil report shows harmful salts, which is common in coastal areas and sabkha soil.
Foundation concrete
Foundation concrete comprises the reinforced elements that carry the building loads to the soil: isolated, combined and strip footings and the raft, with the column necks and the tie beams that link them. Isolated footings are chosen where the soil is good and loads moderate, as in villas; a raft where the soil is weak, footings would nearly touch, or there is a basement and groundwater; and piles where the sound stratum is deep. These elements are usually poured with sulphate-resisting cement and waterproofed on faces touching the soil.
Superstructure concrete
Superstructure concrete comprises the load-bearing elements above ground: columns and concrete walls, floor slabs in their systems, and stairs. Slab systems differ with span and load: a solid slab on beams for short spans and heavy loads, a hordi slab for villas and apartment buildings because it is light and flat underneath, and a flat slab for offices and car parks because it is fast and saves storey height. Concrete walls and shear walls resist wind and earthquake loads in tall buildings, and usually enclose the stairs and lifts.
Reinforcement and formwork
Reinforcement and formwork are the two components that set the rate of reinforced concrete more than the concrete itself. Reinforcement is high-strength deformed bars delivered in 12 m lengths and cut and bent to bar bending schedules, or welded mesh for floors. Formwork is the temporary mould that shapes concrete until it hardens: traditional timber of plywood and battens suits villas and non-repeating shapes, while steel or system formwork suits towers and repeated elements because it is quick to erect and reused many times.
Precast concrete and tanks
This category joins two different kinds of element: precast slabs made in a factory and erected on site by crane, the best known being prestressed hollow-core slabs, which shorten slab construction and need no formwork; and underground concrete tanks cast on site in watertight concrete. Hollow-core is chosen for long spans, regular plans and repetitive projects, and a cast-in-place tank where the plot dictates a shape and capacity that a ready-made tank cannot offer.
Other divisions
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل