Swimming pools in the bill of quantities
A concrete swimming pool is a water-retaining structure that gathers several trades into one item: excavation, the watertight reinforced concrete shell, waterproofing, mosaic or ceramic tiling, then filtration, circulation, disinfection and underwater lighting equipment. Designs differ between the simpler skimmer system common in villas and the perimeter overflow system with channel and balance tank required in public and hotel pools. The system sets both the concrete volume and the equipment, so the price differs clearly between the two.
Where it sits in the bill and what comes before it on site
The pool appears in the external works section as a lump sum or detailed items. Excavation starts with the external works once the groundwater level is known; the filling test precedes waterproofing and tiling; equipment is installed after the pump room is complete.
Items in this category
| Item | Unit |
|---|---|
| Concrete swimming pool | lump sum (or detailed items) |
What is often left out when pricing it
- Filling test of the shell for several days before waterproofing and tiling, with the cost of water and its disposal.
- Items cast into the concrete before pouring: inlets, suction fittings, main drain and light niches.
- Dewatering and resisting flotation of the empty shell on sites with a high water table.
- The pump room and balance tank with their ventilation, and disposal of filter backwash water to an approved discharge point.
Frequently asked questions
Is a pool priced as a lump sum or by items?
Villa bills usually carry it as a lump sum at stated dimensions; large projects break it down into excavation, concrete, waterproofing, tiling and equipment. Even with a lump sum the contractor prepares a detailed take-off of each trade, because all the risks are his: leakage, groundwater and level differences.
How does pricing differ between a skimmer pool and an overflow pool?
The overflow system adds a perimeter channel with its grating, a balance tank, larger pipes and more exacting tiling of the overflow edge, which must be perfectly level. The skimmer system is simpler in concrete and equipment. A price for one system should not be used as a reference for the other.
Who bears leak repairs after the pool is in use?
The contractor does during the defects liability period, as long as the cause lies in the workmanship. That is why the filling test is carried out and recorded before tiling, and construction joints and seals around cast-in items are checked: repairing a leak after tiling means breaking out and redoing the finish.
Related calculators and terms
Other categories in External works and roads
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل