Structural steelwork in the bill of quantities
The category covers the load-bearing steel structure and its covering. The structure is built either as a pre-engineered building, of frames fabricated from plates with tapered sections and cold-formed purlins, or of hot-rolled sections and trusses for heavy loads, overhead cranes and mezzanines. Covering is by single-skin sheeting or by sandwich panels insulated with polyurethane or rock wool. The pre-engineered system is chosen for wide-span warehouses for its light weight and quick supply, and insulated panels where thermal insulation or cooling is required.
Where it sits in the bill and what comes before it on site
They appear in a separate metalwork section after concrete works. Before erection, footings and pedestals are cast, anchor bolts are fixed and checked by survey, the site is prepared for crane movement, and shop drawings and calculations are approved.
Items in this category
| Item | Unit |
|---|---|
| Steel structure for warehouses and hangars | tonne (or m² of covered area) |
| Sandwich panels | m² |
What is often left out when pricing it
- Anchor bolts, their setting templates and non-shrink grout under base plates after alignment.
- Connection plates, bolts and weld metal that add weight above the main sections.
- Surface preparation, the full paint system and touching up welds and scratches after erection.
- Cranes and erection equipment, independent weld inspection and safety measures at height.
Frequently asked questions
Is a steel structure measured by tonne or by square metre?
Conventional structures are measured by tonne from approved shop drawing weights. Pre-engineered buildings are usually offered as a lump sum or per square metre of covered area. The estimator keeps to the bill’s unit, and when converting a supplier’s offer between units checks that weight or area is calculated in the same way.
Are bolts and welds included in the weight paid for?
Weight is usually calculated from net section lengths and plate areas, with no addition for welds or cutting waste. Bolts are either deemed included in the rate per tonne or added by weight, as the preambles state. The measurement method is read first, and whatever is not measured is carried in the unit rate.
Why is a fixed weight per square metre not valid for pre-engineered buildings?
Because the structure’s weight changes with clear span, eave height, frame spacing, regional wind load and the presence of an overhead crane, mezzanine or suspended loads. Two warehouses of the same area can differ widely in weight, so it is taken from a preliminary design of the project itself, not from a previous one.
Related calculators and terms
Other categories in Metal and steel works
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل