Plain concrete in the bill of quantities

Plain concrete is unreinforced or lightly reinforced concrete that has no main structural role. Its best-known uses are blinding under foundations, which gives a level, clean surface for fixing steel, and the ground slab bearing on compacted soil, usually reinforced with welded mesh to control shrinkage cracks. It is poured at low strength for blinding and medium strength for floors, with sulphate-resisting cement wherever the soil report shows harmful salts, which is common in coastal areas and sabkha soil.

Where it sits in the bill and what comes before it on site

Blinding comes first in the concrete section, straight after excavation, and the ground slab comes after foundation concrete and backfilling. Blinding is preceded by approval of the excavation bottom; the ground slab by completed backfill and compaction, buried services and soil treatment.

Items in this category

ItemUnit
Blinding concretem² of stated thickness (or m³)
Slab on gradem² of stated thickness (or m³)

What is often left out when pricing it

Frequently asked questions

Is blinding measured in square or cubic metres?

It comes both ways: in square metres with the thickness given in the description, or in cubic metres. The risk in the area item is pricing it by mistake at a cubic-metre rate, and in the volume item calculating the quantity without the projection beyond the foundation. Description and unit are read together before pricing.

When is sulphate-resisting cement required in concrete touching the soil?

It is required when the soil and groundwater analyses in the investigation report show a harmful sulphate concentration, and the report names the cement type needed. Many specifications demand it for all below-ground concrete as a precaution. Where sulphates combine with chlorides in sabkha soil, the specification sets a special mix.

Is the mesh reinforcement of the ground slab included in its rate?

In most bills the mesh is named in the ground slab description and is therefore carried in the rate per square metre, together with mesh laps and chairs. Where the reinforcement is ordinary bars and the bill has a separate steel item per tonne, it is measured there. The description and the preambles decide.

Related calculators and terms

Other categories in Concrete works

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل