Site preparation and earthworks in the bill of quantities
5 categories and 13 items
What the division covers
This division covers everything that precedes the first cubic metre of concrete: taking over and surveying the site, clearing, levelling and hoarding it, demolishing old buildings, then excavating for foundations or a basement, backfilling and compaction, treating the soil under the building, and shoring the excavation sides and lowering groundwater where needed. These works open the programme and decide when the concrete frame can start. Pricing them depends on reading the soil report and visiting the site more than on the drawings, because soil type, water table and haul distance to the approved dump change the real cost greatly between sites, though the quantities look simple in the bill.
Where it weighs most
This division weighs most in residential and commercial towers with basements, in hospitals and complexes with underground parking, in warehouses and factories whose wide plots need levelling and soil replacement, and in villas built on rocky or sloping land or on sabkha soil near the coasts.
Site preparation
Site preparation is the group of works that make the land ready for construction: removing debris, vegetation and topsoil, levelling the ground to the design levels, erecting the temporary hoarding and the project signboard as the municipality requires, and demolishing existing buildings where present. Some works are priced by area or length and some as a lump sum within the preliminaries. The engineer chooses the measurement method according to how clear the site condition is; the vaguer the condition, the riskier a lump-sum item is for the contractor.
Excavation
Excavation covers removing soil to reach the founding level: excavation for isolated footings and tie beams, open bulk excavation for a basement or raft, trenches for service lines, and excavation in rock. It is done with excavators and loaders in ordinary soil and with hydraulic breakers in rock, since blasting is not allowed inside built-up districts. The soil report decides the type of plant, the slope of the sides and the need for shoring or dewatering, so it is read before pricing any item in this category.
Backfilling and compaction
Backfilling means refilling the voids around foundations, under ground slabs and behind basement walls with approved soil spread in layers, moistened and compacted to the required degree. Excavated material is used when tests prove it suitable, which is the more economical option, and selected imported soil replaces it when the excavated material is clayey, sabkha or full of rubbish. Soil replacement means removing weak soil below the founding level and placing engineered fill instead, as the soil report recommends.
Under-slab soil treatment
This category joins two works that precede pouring the ground slab: spraying the soil with termiticide and laying polyethylene sheet. The first forms a chemical barrier that stops subterranean termites reaching timber and finishes, and is applied in stages: on the bottom and sides of excavations, then on the backfill, then under the slab. The second is a barrier that stops moisture rising from the soil and keeps the concrete’s water from draining away during the pour. Both are small in the bill, but neither can be corrected afterwards.
Shoring and dewatering
These works are needed when safe sloped sides cannot be cut or the excavation bottom lies below groundwater level. Shoring is built with contiguous or secant piles, steel soldier posts with lagging, steel sheet piles, or shotcrete with soil nails, supported by ground anchors or internal struts as depth increases. Dewatering is done by open sump pumps where the water is only slightly above the bottom, and by wellpoints or deep wells where it is high. A specialist contractor chooses the system from the soil report.
Other divisions