العربية Try the demo Start now
Home › BOQ items guide › Plumbing and drainage › Sewage disposal and rainwater

Sewage disposal and rainwater in the bill of quantities

Where no public sewer exists, building sewage goes to a septic tank that settles the solids, then to a soakaway pit or leaching field where the liquid percolates into the soil, or to a sealed holding tank emptied by tankers in impermeable soil or where groundwater is high. Rainwater is collected from roofs by outlets, gutters and downpipes separate from the foul drainage and discharged to the street, storm network or soakaway wells. Low rainfall in Saudi Arabia does not remove this system: it is designed for short, intense storms.

Where it sits in the bill and what comes before it on site

The septic tank appears in external works or at the end of the plumbing bill and is built once the last inspection chamber level is fixed. Rainwater downpipes are listed with drainage, and roof outlets are set before roof waterproofing and screed to falls.

Items in this category

ItemUnit
Septic tank and soakawayNo. (or lump sum)
Rainwater drainagelin. m for downpipes, No. for roof outlets

What is often left out when pricing it

Frequently asked questions

Are the septic tank and soakaway priced as a lump sum or as detailed items?

They usually appear as one item, by number or lump sum, to dimensions on the drawings, covering excavation, concrete, blockwork, waterproofing and covers. When pricing, break it into components and price each by its quantity; do not rely on an overall figure from a previous project, as depth and soil type change the cost considerably.

How do a permeable soakaway and a sealed holding tank differ in pricing?

A permeable soakaway has open-jointed walls and an uncast bottom so liquid percolates; it has no waterproofing or base concrete. A sealed tank has reinforced concrete walls and base waterproofed inside and out with no leakage, costs more and needs periodic emptying. The competent authority decides which is permitted by soil and groundwater level.

How do I take off rainwater downpipes and roof outlets?

The designer fixes number and sizes from the roof area each outlet serves and the city’s design rainfall intensity under the plumbing code. The estimator counts outlets and downpipes from the roof plan, measures each downpipe from roof to discharge point, and checks that secondary emergency drainage exists for every roof enclosed by a parapet.

Related calculators and terms

Other categories in Plumbing and drainage

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل