Work out ready-mix concrete volume in cubic metres for footings, columns, slabs and rafts, with a realistic waste allowance and the mixer loads to order.

Calculator

💡 Order the last load only after taking off what is genuinely left to pour — one surplus cubic metre sent back costs far less than a shortfall that stops the pour.

How the calculation works

Net volume = length x width x thickness (or height). Add 3-5% waste to cover formwork tolerances, spillage and losses in the pump line. Loads = total volume divided by mixer capacity, normally 7-10 m3 per truck in the Saudi market.

Frequently asked questions

How much waste should I allow on a concrete order?

Between 3% for regular elements in tight formwork and 5% for complicated shapes or long pump runs. A figure consistently above 5% points at leaking formwork or habitual over-ordering, not at the supplier.

How do I calculate concrete for columns?

Multiply the column cross-section by its height and by the number of columns: twenty columns at 0.3 x 0.7 m and 3 m high give 0.3 x 0.7 x 3 x 20 = 12.6 m3 net, before waste.

Does the result include blinding and screed?

No. Blinding, screed and any lean-concrete working slab are separate items. Measure each one by its own area and thickness and run it through the calculator again.

How do I convert cubic metres into cement, sand and aggregate?

Only for site-mixed concrete, and only from the approved mix design. Ready-mix is bought by the cubic metre delivered, which is how almost all structural concrete in Saudi Arabia is supplied.

Need a whole bill of quantities priced, not one material?

Upload your BOQ and get every line priced at Saudi market rates in minutes — VAT and all.