Site preparation in the bill of quantities

Site preparation is the group of works that make the land ready for construction: removing debris, vegetation and topsoil, levelling the ground to the design levels, erecting the temporary hoarding and the project signboard as the municipality requires, and demolishing existing buildings where present. Some works are priced by area or length and some as a lump sum within the preliminaries. The engineer chooses the measurement method according to how clear the site condition is; the vaguer the condition, the riskier a lump-sum item is for the contractor.

Where it sits in the bill and what comes before it on site

Its items appear at the start of the bill of quantities, within the preliminaries or heading the earthworks section. Before they start, the site is formally handed over with boundaries and benchmarks fixed, the building or demolition permit issued and existing services disconnected.

Items in this category

ItemUnit
Site clearance and levellingm² (or lump sum)
Temporary site hoardinglin. m (or lump sum)
Demolition of existing buildings and debris removalm² of floor area (or m³ or lump sum)

What is often left out when pricing it

Frequently asked questions

Is site clearance priced per square metre or as a lump sum?

Most bills give the item per square metre of plot area, small projects as a lump sum. Either way the rate is built on a site visit: the real volume of debris, the level differences and the thickness of topsoil to be stripped, because area alone does not show the amount of work.

Who owns the demolition salvage, and is its value deducted from the rate?

Salvage normally passes to the contractor unless the contract states otherwise, so the contractor reduces the rate by what can be recovered from steel, doors and air-conditioning units. The common error is to overvalue this before inspecting the building and finding out what the owner has already removed.

Is the temporary hoarding paid as a separate item?

It varies from one bill to another: some give it its own item per linear metre, others treat it as a preliminary whose cost is spread over the other rates. So the preambles are read before pricing; if there is no item, its cost, maintenance and removal must be carried in the project overheads.

Related calculators and terms

Other categories in Site preparation and earthworks

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل