Electrical works in the bill of quantities

5 categories and 14 items

What the division covers

Electrical works in Saudi buildings cover everything between the Saudi Electricity Company supply point and the last outlet: embedded conduits and boxes, wires, cables and their containment, main and sub-distribution boards, light fittings, switches and sockets, earthing and lightning protection, and the low-current systems of fire alarm, surveillance and data. They start with conduits laid as the slabs are cast, continue through blockwork and plastering, and end with fixing the fittings and testing after painting. Pricing calls for an exact take-off of points and lengths from the drawings and load schedules, because the items are many and small and the copper price moves between tender and delivery.

Where it weighs most

This division is heaviest in hospitals, data centres, offices, commercial buildings and hotels, with dense loads, low-current systems and generators, and in factories and warehouses, with long cable runs and containment. It is moderate in villas, residential blocks, schools and mosques, where lighting points, sockets and small boards dominate.

Conduits and wiring

Conduits and boxes protect the wires and allow them to be drawn in and replaced; insulated copper wires feed the final circuits for lighting, sockets and air conditioning. Rigid PVC conduits embedded in slabs and walls are used in most residential and commercial buildings, galvanised steel conduits where runs are exposed or liable to impact or in industrial buildings, and flexible conduits for final connection to equipment. Wire sizes are selected from the load schedule according to the breaker rating and the circuit length.

Cables and containment

Cables carry power from the supply point to the main board and from it to the sub-boards and large equipment. Common in buildings are multi-core copper cables with cross-linked polyethylene insulation and PVC sheath, steel-wire armoured when buried or exposed to damage and unarmoured on trays inside the building; aluminium cables are used for large feeders where the specification allows. Cables are carried on perforated trays, ladders or in metal trunking, the type being chosen by cable weight and environment.

Distribution boards

Boards distribute power and protect circuits. The main board receives the supply from the company meter or transformer and generator and feeds the sub-boards; it is floor-standing with moulded-case or air circuit breakers and copper busbars. Sub-boards are wall-mounted with miniature circuit breakers feeding lighting, socket and air-conditioning circuits on each floor or flat. Automatic transfer switch panels, power factor correction panels and motor control panels are added as required. Boards are assembled locally by approved panel builders with components named in the description or subject to approval.

Lighting and wiring accessories

This category holds what is installed last and seen by the user: internal light fittings, switches and sockets, and external site lighting with its poles. LED fittings are now the norm for their efficiency and long life, ranging from downlights recessed in false ceilings and square panels for offices to linear, surface and moisture-resistant types. Switches and sockets vary from economy to luxury grades with the project level. External lighting covers road and car park poles, facade floodlights and garden lighting, with buried supply and control by photocell or timer.

Earthing and low-current systems

This category gathers the safety and communications systems. Earthing discharges fault current to ground and bonds metal parts equipotentially; lightning protection intercepts the strike and conducts it to earth by a safe path. Low-current systems comprise the fire alarm, which is subject to Civil Defense approval, surveillance cameras and the data and telephone network; public address, access control and television may be added. These systems are usually supplied and programmed by a specialist subcontractor, while the main contractor remains responsible for conduits and coordination.