Conduits and wiring in the bill of quantities
Conduits and boxes protect the wires and allow them to be drawn in and replaced; insulated copper wires feed the final circuits for lighting, sockets and air conditioning. Rigid PVC conduits embedded in slabs and walls are used in most residential and commercial buildings, galvanised steel conduits where runs are exposed or liable to impact or in industrial buildings, and flexible conduits for final connection to equipment. Wire sizes are selected from the load schedule according to the breaker rating and the circuit length.
Where it sits in the bill and what comes before it on site
Its items open the electrical bill, by linear metre or carried in the rate per point. Slab conduits are laid over the bottom reinforcement before casting, wall conduits after blockwork and before plastering, and wires are drawn after plastering and before the final paint coat.
Items in this category
| Item | Unit |
|---|---|
| Electrical conduits | lin. m (or within the point rate) |
| Copper wiring | lin. m (or within the point rate) |
What is often left out when pricing it
- Pull and junction boxes with their covers, and the draw wire left in empty conduits for future systems.
- Chasing blockwork and making good, and capping conduit ends during casting and plastering.
- The green-and-yellow earth wire in every circuit, a full length added to the phase and neutral wires.
- Wire tails inside boards and boxes, circuit labelling, and insulation and continuity testing before energising.
Frequently asked questions
What does pricing per point mean in electrical work, and what does a point cover?
A point is a lighting outlet, switch or socket; its rate normally covers conduits, boxes and wires from the distribution board to the outlet, and may include the switch or socket itself, as described. Check whether accessories are included, and work out the actual average point length from the drawings, not from another project.
How do I take off wire lengths from the drawings?
Each circuit route is measured on plan from the board to its last outlet; rises and drops at the board and each switch and socket are added by mounting height; the length is then multiplied by the number of wires, earth wire included. An allowance for tails and wastage, set by company experience, is added.
When are metal conduits required instead of plastic?
Specifications usually require them for exposed runs in electrical and mechanical rooms, car parks and factories, wherever mechanical damage is feared, and for some fire and emergency circuits. The cost difference covers the conduit, threaded fittings, metal boxes and the labour of cutting, threading and earthing, so check the description for each building zone.
Related calculators and terms
Other categories in Electrical works
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل