Cables and containment in the bill of quantities
Cables carry power from the supply point to the main board and from it to the sub-boards and large equipment. Common in buildings are multi-core copper cables with cross-linked polyethylene insulation and PVC sheath, steel-wire armoured when buried or exposed to damage and unarmoured on trays inside the building; aluminium cables are used for large feeders where the specification allows. Cables are carried on perforated trays, ladders or in metal trunking, the type being chosen by cable weight and environment.
Where it sits in the bill and what comes before it on site
Listed after conduits and wiring, before or after the boards, in linear metres per size. Containment is fixed after plastering and first paint coat and, if possible, before false ceilings and air-conditioning ducts; cables are pulled once boards are fixed and the building is closed.
Items in this category
| Item | Unit |
|---|---|
| Low-voltage power cables | lin. m |
| Cable trays | lin. m |
What is often left out when pricing it
- Cable lugs and entry glands at each end; their number is twice the number of cables.
- Excavation, soft sand, protection tiles, warning tape and backfill for cables buried outside the building.
- Sealing cable and tray openings through fire-rated walls and slabs with approved fire-stopping materials.
- Insulation resistance testing of every cable after pulling and before termination, and identification tags at both ends and along the route.
Frequently asked questions
Are cable lugs and glands included in the rate per metre?
In most bills yes: the description states that the rate per metre includes termination at both ends with lugs and glands. Other bills give a numbered item for cable terminations. Short, large cables are the main hazard, because the cost of two terminations is spread over few metres and raises the rate per metre considerably.
How do I measure cable length from the drawings?
The actual route on the containment or in the trench is measured from board to board, with the vertical rises and drops in shafts and at board entries, and with the wide sweeps imposed by the bending radius. Measuring a straight line between the two boards on plan always gives less than is needed.
Who supplies the feeder from the Saudi Electricity Company to the meter?
It depends on load size and supply arrangement. On a low-voltage supply the electricity company runs its cable to the meter and charges the owner for connection; the contractor’s work starts after the meter. Where a transformer room is needed, the contractor prepares the room and routes to the company’s requirements. Check the contract scope.
Related calculators and terms