Excavation in the bill of quantities
Excavation covers removing soil to reach the founding level: excavation for isolated footings and tie beams, open bulk excavation for a basement or raft, trenches for service lines, and excavation in rock. It is done with excavators and loaders in ordinary soil and with hydraulic breakers in rock, since blasting is not allowed inside built-up districts. The soil report decides the type of plant, the slope of the sides and the need for shoring or dewatering, so it is read before pricing any item in this category.
Where it sits in the bill and what comes before it on site
Excavation items come after site preparation and before plain concrete. Digging does not start until the setting-out of axes and levels is approved, buried services are located, the condition of neighbouring buildings is recorded and a stockpile area for material suitable for backfill is agreed.
Items in this category
| Item | Unit |
|---|---|
| Excavation for footings and foundations | m³ |
| Bulk excavation for basements | m³ |
| Excavation in rock | m³ |
| Trench excavation for services | lin. m by depth band (or m³) |
What is often left out when pricing it
- Working space and side slopes that are actually dug but not paid, because measurement is on net geometric dimensions.
- Bulking of soil after excavation, which raises the number of truck trips above what the geometric volume suggests.
- Compacting the bottom of excavation and having the founding level tested and approved by the engineer before blinding is poured.
- Protecting the bottom and sides from rain and flood water, and re-preparing them if damaged before pouring.
Frequently asked questions
Is working space around footings paid within the excavation quantity?
In most contracts in the Kingdom excavation is measured on the net dimensions of the blinding multiplied by the depth, and working space and slopes are carried in the unit rate. Some preambles add a set width on each side, so the wording is checked before the rate is built.
How is excavation in ordinary soil told apart from rock when it comes to payment?
Specifications usually define rock as material that an excavator cannot remove without a hydraulic breaker. When it appears, digging stops, its surface level is surveyed in the engineer’s presence and a record is signed; its volume is then calculated from that level to the bottom of excavation and paid at the rock rate.
Is disposal of surplus excavated material included in the excavation rate?
Usually yes; the customary description includes hauling the surplus to approved dumps whatever the distance. Some bills, however, give haulage its own item per cubic metre, and some oblige the contractor to stockpile material suitable for backfill on site. Haulage is worked out on the bulked volume, not the geometric volume of the excavation.
Related calculators and terms
Other categories in Site preparation and earthworks
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل