Formwork in the bill of quantities

Unitm² of contact area
CategoryReinforcement and formwork
DivisionConcrete works

The item as worded in the bill

Supply, erect and strike formwork to concrete elements, of water-resistant plywood sheets 18 mm thick on timber battens or of steel panels, with steel props and ties, tight at the joints and resisting the pressure of placing without distortion; the rate includes release agent, chamfer strips, forming openings, cleaning and reuse.

Method of measurement

The actual contact area between form and concrete is measured for each element: sides of footings and tie beams, column perimeters by their height, both faces of walls, slab soffits between beams, and beam sides and soffits. Surfaces cast against soil or blinding and top surfaces are not measured. Small openings defined by the method of measurement are not deducted, and stop-ends at construction joints are not measured.

What the unit rate covers

Priced separately

Specification and reference

The Saudi Building Code SBC 304 sets the requirements for formwork design, striking and re-propping, and a well-known design reference is the ACI 347 guide. The project specification sets the surface finish class, the permitted tolerances in dimension and plumb, and the minimum periods before striking side forms and props; safety requirements apply during erection and striking.

What moves the rate

Common pricing mistakes

A published price for its main material

The monthly Kingdom-wide average as published by the General Authority for Statistics, with its monthly series: Indonesian Ablakash Wood

Related calculators and terms

More items in Reinforcement and formwork

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل