Slab on grade in the bill of quantities

Unitm² of stated thickness (or m³)
CategoryPlain concrete
DivisionConcrete works

The item as worded in the bill

Supply and pour concrete for the ground slab on compacted soil, 15 cm thick, grade C25, reinforced with welded steel mesh of 8 mm bars at 20 cm both ways, power-floated, with sawn contraction joints and isolation joints around columns filled with flexible sealant; the rate includes the mesh, chairs and curing.

Method of measurement

The net area of the slab is measured between the inner faces of the tie beams or walls bounding it, or over them where the slab runs across them on the drawings. Column positions and small openings defined by the method of measurement are not deducted. Mesh laps, thickenings under partitions and joints are not measured unless separate items are given.

What the unit rate covers

Priced separately

Specification and reference

Concrete materials and workmanship follow the Saudi Building Code SBC 304, and the soil under the slab is prepared to SBC 303 and the soil report. Welded mesh complies with ASTM A1064 and ready-mix concrete with ASTM C94. The project specification sets the required surface flatness, the joint spacing and the curing method in hot weather.

What moves the rate

Common pricing mistakes

A published price for its main material

The monthly Kingdom-wide average as published by the General Authority for Statistics, with its monthly series: 350 K Normal Concrete

Related calculators and terms

More items in Plain concrete

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل