Column necks in the bill of quantities

Unitm³
CategoryFoundation concrete
DivisionConcrete works

The item as worded in the bill

Supply and pour reinforced concrete for column necks from the top of the footings to the top of the tie beams, to the sections shown in the column schedule, grade C30 with sulphate-resisting cement; the rate includes reinforcement, ties, formwork and its bracing, vibration, curing and two coats of bitumen to buried faces.

Method of measurement

The neck volume is its section multiplied by its height from the top of the footing to the top of the tie beam, the height being taken for each neck from the actual level of its footing, not one value for all. Its junction with the tie beams is included in its volume. Where the neck section differs from the column above, the section shown for the neck is used.

What the unit rate covers

Priced separately

Specification and reference

Necks are built to the Saudi Building Code SBC 304 and treated as concrete exposed to soil as regards cover and cement type according to the soil report. Steel complies with ASTM A615, and the drawings show the lap length of the column starter bars above tie-beam level. The project specification sets the type of protection to buried faces.

What moves the rate

Common pricing mistakes

A published price for its main material

The monthly Kingdom-wide average as published by the General Authority for Statistics, with its monthly series: 350 K Resistant Concrete

Related calculators and terms

More items in Foundation concrete

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل