Sub-distribution boards in the bill of quantities
| Unit | No. |
|---|---|
| Category | Distribution boards |
| Division | Electrical works |
The item as worded in the bill
Supply and install a recessed wall-mounted sub-distribution board in painted sheet steel, three-phase, with a moulded-case main breaker, copper bars for phases, neutral and earth, miniature circuit breakers of the number and ratings in the board schedule, and residual current devices for the designated circuits; the rate includes the door, circuit chart, fixing in the wall, termination and testing.
Method of measurement
Measured by number, each board under its name or each repeated type, such as identical flat boards, to the board schedule that shows the number of circuits and their ratings. All breakers and spare ways are included in the count and not measured separately. Single-phase boards are kept apart from three-phase, recessed from surface-mounted, and emergency boards fed from the generator from normal ones.
What the unit rate covers
- Enclosure, door and lock
- Main breaker and miniature circuit breakers
- Residual current devices
- Phase, neutral and earth bars
- Circuit chart and labelling
- Fixing, termination and circuit testing
Priced separately
- Feeder cable to the board
- Outgoing circuit wiring
- Wall recess and making good the plaster around it
Specification and reference
Built to IEC 61439 and installed to SBC 401, with miniature circuit breakers to IEC 60898 of a breaking capacity suited to the fault level at the board. The code requires 30 mA earth-leakage protection for socket circuits and wet areas; loads are balanced between phases, and spare ways are left in the proportion set by the specification.
What moves the rate
- Number of circuits and phases
- Number and type of residual current devices
- Recessed or surface-mounted, and protection degree
- Origin of breakers and their breaking capacity
Common pricing mistakes
- Pricing all flat boards as one type when some types have more air conditioner and heater circuits according to flat area.
- Allowing one residual current device per board when the schedule requires one per group of circuits or combined devices per circuit.
- Choosing an enclosure with ways equal to the circuits in use only, leaving no room for the specified spare ways.
- Forgetting that a recessed board is fixed in two stages: the enclosure before plastering, and breakers and door after painting.
Related calculators and terms
More items in Distribution boards
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل