Backfilling and compaction in layers in the bill of quantities

Unitm³
CategoryBackfilling and compaction
DivisionSite preparation and earthworks

The item as worded in the bill

Backfill around foundations and under ground slabs with clean approved soil from the excavation, spread in layers not exceeding 25 cm each, including watering and mechanical compaction to not less than 95% of maximum dry density; the rate includes field density tests on every layer.

Method of measurement

The compacted in-place volume is measured geometrically: the paid excavation volume less the volume of buried concrete and masonry, plus filling above ground level up to the underside of the ground slab. No allowance is added for shrinkage on compaction or for filling working space and slopes whose excavation was not paid in the first place.

What the unit rate covers

Priced separately

Specification and reference

Backfill requirements and degree of compaction are set in the Saudi Building Code SBC 303, the soil report and the project specification. Maximum dry density is determined by the modified Proctor test to ASTM D1557, and field density by the sand-cone method to ASTM D1556 or by nuclear gauge, at the test frequency set in the inspection plan.

What moves the rate

Common pricing mistakes

Related calculators and terms

More items in Backfilling and compaction

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل