Temporary site hoarding in the bill of quantities

Unitlin. m (or lump sum)
CategorySite preparation
DivisionSite preparation and earthworks

The item as worded in the bill

Supply and erect a temporary hoarding around the site, 2.4 m high, of corrugated galvanised steel sheets fixed to steel posts and rails on concrete bases, with a vehicle gate, a personnel door, the project signboard and warning lights as the municipality requires; the rate includes maintenance throughout the project and removal on completion.

Method of measurement

The actual length of the hoarding is measured along its centre line around the site perimeter; the height is fixed by the item description and is not measured. Gates are counted within the length unless a separate item by number is given. Relocating or re-erecting the hoarding for construction phases is not paid unless the contract says so, and the hoarding remains the contractor’s property after dismantling.

What the unit rate covers

Priced separately

Specification and reference

The hoarding is subject to the requirements of the municipality that issued the building permit regarding height, colour, signboard and not encroaching on the pavement, and to the provisions for protecting pedestrians and adjoining property during construction in the Saudi Building Code SBC 201. The project specification sets the sheet thickness and the post spacing.

What moves the rate

Common pricing mistakes

Related calculators and terms

More items in Site preparation

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل