Excavation in rock in the bill of quantities

Unitm³
CategoryExcavation
DivisionSite preparation and earthworks

The item as worded in the bill

Excavate in rock of any type and hardness using hydraulic breakers mounted on excavators and without explosives, down to the levels shown on the drawings, including trimming the bottom and sides and loading and hauling the broken rock to approved dumps; rock is measured from its surface level as fixed in a joint record with the engineer.

Method of measurement

The actual rock volume is measured between the rock surface level, surveyed when exposed in the engineer’s presence, and the design bottom of excavation, within the net excavation dimensions. Overbreak below the level or outside the limits is not paid, and the contractor fills any overbreak under foundations with concrete at his own cost. The bill states whether the rate is a full rate or an extra over ordinary excavation.

What the unit rate covers

Priced separately

Specification and reference

The definition of rock and how it is proved rest on the project specification and the strata description in the soil report prepared under the Saudi Building Code SBC 303. Blasting is not allowed within urban areas except with special permits from the security authorities, so most specifications call for mechanical breaking only, with vibration controlled near existing buildings.

What moves the rate

Common pricing mistakes

Related calculators and terms

More items in Excavation

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل