Site clearance and levelling in the bill of quantities
| Unit | m² (or lump sum) |
|---|---|
| Category | Site preparation |
| Division | Site preparation and earthworks |
The item as worded in the bill
Clear the site of debris, rubble, vegetation and roots, strip the topsoil to a depth of 20 cm and level the ground to the levels shown on the drawings by cut and fill within the site boundaries, including removal of arisings to the municipality-approved dump; the rate includes level surveys before and after the work.
Method of measurement
The horizontal area of the land is measured within the property boundaries or the limits of work shown on the drawings, with no addition for slopes or irregularities. Levelling within the specified stripping thickness is deemed included in the rate; cut or fill beyond it is measured in cubic metres under the excavation and filling items, based on the joint survey before and after the work.
What the unit rate covers
- Removal of debris, vegetation and roots
- Stripping topsoil to the specified thickness
- Rough levelling by plant
- Loading and haulage to the approved dump
- Level surveys before and after
Priced separately
- Cut and fill beyond the specified stripping thickness
- Demolition of existing buildings and foundations
- Diverting or protecting buried service lines
Specification and reference
The item is governed by the project specification and by the municipality’s requirements for hauling waste to approved dumps, with the construction-site safety provisions of the Saudi Building Code SBC 201 observed. The engineer approves the survey record of original levels before any levelling starts, and that record is the reference for measurement.
What moves the rate
- Actual volume and nature of the debris
- Level differences and roughness of the ground
- Haul distance to the dump and its fees
- Site area and ease of plant access
Common pricing mistakes
- Pricing from the plan area without a site visit, then finding old dumped fill whose volume exceeds everything assumed.
- Starting to level before the original-levels record is signed with the engineer, losing the right to claim extra cut and fill.
- Counting topsoil stripping here and then again within the depth of the general foundation excavation.
- Overlooking that arisings bulk when loaded, so truck trips are worked out on the in-ground volume.
Related calculators and terms
More items in Site preparation
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل