Site clearance and levelling in the bill of quantities

Unitm² (or lump sum)
CategorySite preparation
DivisionSite preparation and earthworks

The item as worded in the bill

Clear the site of debris, rubble, vegetation and roots, strip the topsoil to a depth of 20 cm and level the ground to the levels shown on the drawings by cut and fill within the site boundaries, including removal of arisings to the municipality-approved dump; the rate includes level surveys before and after the work.

Method of measurement

The horizontal area of the land is measured within the property boundaries or the limits of work shown on the drawings, with no addition for slopes or irregularities. Levelling within the specified stripping thickness is deemed included in the rate; cut or fill beyond it is measured in cubic metres under the excavation and filling items, based on the joint survey before and after the work.

What the unit rate covers

Priced separately

Specification and reference

The item is governed by the project specification and by the municipality’s requirements for hauling waste to approved dumps, with the construction-site safety provisions of the Saudi Building Code SBC 201 observed. The engineer approves the survey record of original levels before any levelling starts, and that record is the reference for measurement.

What moves the rate

Common pricing mistakes

Related calculators and terms

More items in Site preparation

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل