Polyethylene sheet under concrete in the bill of quantities
| Unit | m² |
|---|---|
| Category | Under-slab soil treatment |
| Division | Site preparation and earthworks |
The item as worded in the bill
Supply and lay polyethylene sheet 250 microns thick (1000 gauge) in one layer over the compacted and treated soil under the ground slab and blinding, with laps of not less than 15 cm between sheets sealed with adhesive tape and edges turned up against the sides of the tie beams, including repair of any tear before the pour.
Method of measurement
The net horizontal area covered by the sheet is measured, normally equal to the area of the ground slab or blinding above it. Laps, edges turned up against tie beams and walls, and waste from cutting rolls are not measured. Positions of columns and small pipes are not deducted. Where two layers are required, the area is measured once and the number stated in the description.
What the unit rate covers
- Sheet of the specified thickness
- Laps and turned-up edges
- Tape for sealing laps
- Cutting around columns and pipes
- Repairing tears before the pour
Priced separately
- Fine sand layer under the sheet, if required
- Anti-termite soil treatment
- Waterproofing of foundations and basement
Specification and reference
The project specification sets the sheet thickness, the number of layers and the lap, and the provisions of the Saudi Building Code SBC 201 for protecting slabs in contact with the ground from moisture are observed. Well-known standards for this sheet are ASTM D4397 for polyethylene sheeting in general and ASTM E1745 for vapour retarders under concrete slabs.
What moves the rate
- Sheet thickness and number of layers
- Lap width and roll width
- Number of columns and tie beams to cut around
- Evenness of the soil surface and absence of sharp gravel
Common pricing mistakes
- Buying sheet for the paid area only without adding laps, turned-up edges and cutting waste.
- Pricing light sheet sold by the roll in the market without checking that its thickness meets the specification.
- Laying the sheet days before the steel is fixed, so sun and foot traffic tear it and it is replaced before the pour.
- Pricing it as its own item although it is also named in the ground slab description, or dropping it from both.
Related calculators and terms
More items in Under-slab soil treatment
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل