Asphalt paving courses in the bill of quantities

Unitm² (or tonne)
CategoryAsphalt and roads
DivisionExternal works and roads

The item as worded in the bill

Supply, lay and compact hot-mix asphalt wearing course 5 cm thick after compaction, with 60/70 penetration grade bitumen and an approved Marshall-designed mix, laid by mechanical paver and compacted with steel and pneumatic rollers; the rate includes tack coat, cleaning the surface, longitudinal and transverse joints, and core samples.

Method of measurement

Measured in square metres for each course at its stated compacted thickness, over the area laid within the limits of the approved section. Islands and planters are deducted; manhole covers are not. Excess thickness is not paid, and a shortfall proven by cores is dealt with under the specification. Where measured by the tonne, weighbridge tickets for material actually laid are used, within the theoretical thickness.

What the unit rate covers

Priced separately

Specification and reference

Governed by the Saudi Highway Code and the general specifications for road and bridge construction, and by municipality standards for local streets. The job mix is approved on a laboratory design fixing grading, bitumen content, stability and air voids; mix temperature is monitored at laying and rolling, and thickness and compaction are verified by cores at an approved laboratory.

What moves the rate

Common pricing mistakes

Related calculators and terms

More items in Asphalt and roads

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.

Start nowجرّب بلا تسجيل