Stamped concrete in the bill of quantities
| Unit | m² |
|---|---|
| Category | Paving |
| Division | External works and roads |
The item as worded in the bill
Supply and construct stamped concrete paving 10 cm thick in C25 ready-mixed concrete reinforced with welded steel mesh, with dry-shake colour hardener, release agent and stamping with rubber mats to the approved pattern; the rate includes side forms, saw-cut control joints, washing and two coats of clear protective sealer.
Method of measurement
Measured in square metres of finished exposed surface, with planting beds, covers and columns deducted according to the deduction limits in the preambles. Stamped steps and bed edgings are measured in linear metres where an item exists. Thickness, reinforcement and control joints are not measured separately, and nothing is added for multiple colours or pattern borders.
What the unit rate covers
- Ready-mixed concrete at the stated thickness and mesh reinforcement
- Side forms and polyethylene sheet under the slab
- Colour hardener and release agent
- Stamping with mats and saw-cut control joints
- Washing, clear sealer and curing
Priced separately
- Excavation and compacted base course
- Expansion joints against buildings and their fillers
- Storm drainage channels
- Periodic re-coating of the sealer
Specification and reference
Concrete is governed by the Saudi concrete code SBC 304 for materials, placing and curing in hot weather; colouring, release and sealing materials follow the manufacturer’s data sheets and the project specification. A site-made sample of pattern and colour is approved before work starts, and control joints are cut early at a spacing proportionate to slab thickness.
What moves the rate
- Slab thickness and concrete grade
- Number of colours and pattern complexity
- Area that can be poured and stamped in one day
- Sealer type and number of coats
Common pricing mistakes
- Pricing it as an ordinary slab plus a small extra, although colouring and sealing materials and specialist stamping labour make most of the difference.
- Not allowing for splitting the pour into small bays that can be stamped before the surface sets in summer heat, which adds working days.
- Leaving out the second sealer coat or the anti-slip additive around pools, both of which the engineer requires at handover.
- Leaving saw-cut control joints out of the rate, so random cracks appear that the contractor must repair at his own cost.
A published price for its main material
The monthly Kingdom-wide average as published by the General Authority for Statistics, with its monthly series: 250 K Normal Concrete
Related calculators and terms
More items in Paving
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل