Aggregate base course in the bill of quantities
| Unit | m³ (or m² at a stated thickness) |
|---|---|
| Category | Asphalt and roads |
| Division | External works and roads |
The item as worded in the bill
Supply, spread and compact crushed graded aggregate base course 20 cm thick after compaction, laid in two layers, watered to optimum moisture content and compacted to not less than 98 percent of modified Proctor maximum dry density; the rate includes mixing, trimming to levels and falls, and field and laboratory testing.
Method of measurement
Measured in cubic metres after compaction: the area from the approved sections multiplied by the theoretical thickness, or in square metres for each stated thickness. Thickness beyond that required and width beyond the section are not paid. Nothing is added for bulking or for volume loss on compaction; the contractor allows for the loose quantity delivered in his rate analysis.
What the unit rate covers
- Supply and haulage of crushed graded aggregate
- Mixing and watering to optimum moisture
- Spreading by grader and compaction by rollers
- Final trimming to levels and falls
- Grading and field density tests
Priced separately
- Preparing and compacting the subgrade
- Sub-base course where separately billed
- Bituminous prime coat
- Replacement of unsuitable soil
Specification and reference
Governed by the Saudi Highway Code and the general specifications for road and bridge construction on municipal and road projects, and by the project specification within private sites. Grading, California bearing ratio, plasticity limits and abrasion loss are specified; maximum density is found by the modified Proctor method ASTM D1557, and field density is verified on each layer.
What moves the rate
- Haul distance from the crusher to the site
- Thickness and number of layers
- Required degree of compaction and availability of water
- Area, continuity and room for large plant to work
Common pricing mistakes
- Working out the delivered quantity at the compacted volume, although loose material in the tippers is bulkier and shrinks on compaction.
- Pricing ordinary fill material instead of crushed graded aggregate within the grading limits, so the laboratory rejects it on testing.
- Leaving out water tankers for moisture conditioning on sites far from a water source, though they run throughout spreading.
- Not allowing for re-trimming and re-compaction after other contractors’ plant has crossed the layer before asphalt.
Related calculators and terms
More items in Asphalt and roads
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل