External render in the bill of quantities
| Unit | m² |
|---|---|
| Category | Plastering |
| Division | Plaster, paint and gypsum works |
The item as worded in the bill
Supply and apply external cement render to elevations, not less than 20 mm thick in a spatterdash, an undercoat and a finishing coat, in cement mortar with a water-resisting admixture, including reinforcing mesh at concrete-to-block junctions, forming grooves and feature joints as shown on the elevation drawings and water curing; the rate includes external scaffolding.
Method of measurement
Measured in square metres of net area from the elevation drawings, deducting window and door openings and adding their reveals, sills and heads. Parapets are measured on both faces with their top, as are soffits of projections and canopies and the walls of light wells. Curved surfaces and round columns are measured on their developed area; grooves and feature joints are not measured separately unless a linear item is provided.
What the unit rate covers
- Spatterdash, undercoat and finishing coat with the water-resisting admixture
- Reinforcing mesh at concrete-to-block junctions
- Corner beads and drip grooves at the edges of projections
- External scaffolding and safety netting
- Water curing and protection from direct sun
Priced separately
- External paint or textured coating
- Precast projecting cornices and mouldings
- External thermal insulation system, if any
Specification and reference
Executed to the exterior plaster provisions of the Saudi general building code SBC 201 and to the project specification. Cement complies with ASTM C150 and coats are applied to ASTM C926. In coastal areas and saline soils the specification fixes the cement type and the cleanliness of sand and water, and requires longer curing in hot weather.
What moves the rate
- Building height, scaffold type and how long it stays up
- Number of grooves, projections and architectural details on the elevation
- Summer execution with its shift pattern and repeated wetting
- Type of admixtures required and cement specified
Common pricing mistakes
- Measuring the parapet on one face and forgetting its inner face and top, which add a considerable area around the whole roof perimeter.
- Not allowing the full hire period of external scaffolding, although it stays in place until painting or cladding after the render is finished.
- Omitting the render to light wells, annexes, roof rooms and the stair head because they do not appear on the four main elevations.
- Pricing the elevation as a plain surface when its drawings are full of grooves and window surrounds that multiply finishing labour.
A published price for its main material
The monthly Kingdom-wide average as published by the General Authority for Statistics, with its monthly series: white soft Sand
Related calculators and terms
More items in Plastering
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل