Home › BOQ items guide › Flooring and cladding › Screeds and terrazzo › Floor screed

Floor screed in the bill of quantities

Unitm² (or m³ for screeds to falls)
CategoryScreeds and terrazzo
DivisionFlooring and cladding

The item as worded in the bill

Supply and lay cement–sand floor screed of 5 cm average thickness, of Portland cement and clean graded sand in a semi-dry consistency, laid on the concrete slab after cleaning, dampening and applying a cement bonding slurry, ruled off to the stated levels and falls and trowelled, including control joints and water curing, ready to receive the final finish.

Method of measurement

Measured in square metres of net area laid between walls with the average thickness stated, deducting columns and plinths. Each different thickness is measured under a separate item. Screeds to falls of varying thickness on roofs and in bathrooms are measured in square metres at average thickness or in cubic metres as the bill provides. Mesh, fibres, perimeter strip and bonding slurry are not measured separately unless stated.

What the unit rate covers

Priced separately

Specification and reference

The project specification fixes mix proportions or strength, thickness and flatness. Cement complies with ASTM C150 and sand is clean, graded and salt-free. Screed materials are classified under EN 13813 where specified. It is cured by water or covering for several days and protected from rapid drying in hot weather; the general provisions of the Saudi code SBC 201 apply.

What moves the rate

Common pricing mistakes

A published price for its main material

The monthly Kingdom-wide average as published by the General Authority for Statistics, with its monthly series: Black National Cement

Related calculators and terms

More items in Screeds and terrazzo

Price your whole bill of quantities

Upload the bill of quantities and its items are priced from published references, each with its price source.