Defects Liability Period فترة الضمان
Definition
The period after preliminary handover, usually a year, during which the contractor is bound to repair defects.
Example
A leak appeared during the DLP and was repaired at the contractor’s cost.
Where it is used
Assuring quality after handover.
Related terms
From the term to the work
Etimadco turns these concepts into daily working tools for your projects.
Start free