Sandwich panels in the bill of quantities
| Unit | m² |
|---|---|
| Category | Structural steelwork |
| Division | Metal and steel works |
The item as worded in the bill
Supply and install 50 mm roof sandwich panels of two pre-painted galvanised steel skins 0.5 mm thick with a polyurethane foam core of 40 kg/m³ density between them, fixed to purlins with self-drilling screws with sealing washers, including side laps, ridge cap, edge trims and sealing mastic.
Method of measurement
Measured by square metre on the net area covered, taken on the slope for roofs and on the face for walls. Side laps, end laps and cutting waste are not measured. Openings for doors, windows and skylights are deducted. Ridge caps, trims and gutters are measured by linear metre in separate items, unless the description states they are carried in the square-metre rate.
What the unit rate covers
- Panels of the specified thickness and core
- Fixing screws and sealing washers
- Sealing tapes and mastic at laps
- Cutting around openings
- Lifting and installation
- Trims where the description says so
Priced separately
- Supporting purlins and girts
- Gutters and rainwater downpipes
- Translucent skylight panels
- Roof ventilators and vents
Specification and reference
They are governed by the project specification and the manufacturer’s data sheet for core type and density, sheet thickness and coating type. Insulation thickness meets SBC 601 or SBC 602 requirements for roofs and walls; the fire performance of the core follows SBC 201, SBC 801 and Civil Defense requirements, and panel fixing resists wind uplift under SBC 301.
What moves the rate
- Core type and thickness: polyurethane or rock wool
- Sheet thickness and coating type
- Roof or wall panels and panel length
- Building height and quantity
Common pricing mistakes
- Measuring the roof on plan instead of the sloping area, and forgetting the panel overhang at eaves and gable ends.
- Pricing a polyurethane core while the building’s fire requirements impose rock wool, which is heavier and costlier.
- Ordering panels on the overall panel width rather than the effective cover width after lapping, so the quantity supplied falls short.
- Dropping the ridge cap, trims and corners when the description states they are carried in the square-metre rate.
Related calculators and terms
More items in Structural steelwork
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل