Ducted (concealed) split unit in the bill of quantities
| Unit | No. |
|---|---|
| Category | Split air conditioning |
| Division | HVAC and fire fighting |
The item as worded in the bill
Supply and install ducted (concealed) split air conditioner mounted above the suspended ceiling, cooling capacity 36,000 Btu/h, medium external static pressure, complete with outdoor unit and wired thermostat; the rate includes hanger rods, vibration isolators, flexible connections at air inlet and outlet, filter, drain pan, start-up and testing, and excludes ductwork and air outlets.
Method of measurement
Measured by number for each complete set, classified by capacity and static pressure. The ducts, plenum boxes and outlets connected to it are measured under their own items, as are copper and drain piping where a first-fix item exists. During take-off, check that the number of thermostats matches the number of units and that each unit has an access panel on the ceiling drawing.
What the unit rate covers
- Concealed indoor unit and outdoor unit
- Threaded hanger rods and vibration isolators
- Flexible connections at air inlet and outlet
- Return air filter and drain pan
- Wired thermostat and control cable
- Evacuation, charging, start-up and testing
Priced separately
- Ductwork, its insulation and plenum boxes
- Air outlets and return grilles
- Access panel in the suspended ceiling
- Power supply and isolator
Specification and reference
Governed by the Saudi mechanical code SBC 501 and the energy-efficiency requirements of SBC 601 and SBC 602. The unit’s static pressure is selected to cover the resistance of the actual ducts and outlets, the manufacturer’s maintenance clearances are kept around it, and the drain pan is given a fall and a trap to the manufacturer’s instructions.
What moves the rate
- Cooling capacity and available static pressure
- Compressor type and energy-efficiency rating
- Ceiling height and difficulty of hanging and access
- Copper run length to the outdoor unit
Common pricing mistakes
- Selecting a low static pressure unit for long ducts, so it is later replaced by a higher-pressure unit at the contractor’s expense.
- Leaving out flexible connections, return air box and filter on the assumption that the duct items cover them, when they do not.
- Not pricing the access panel under the unit or coordinating it with the ceiling contractor, so the filter and motor cannot be serviced.
- Forgetting the drain pan trap and pipe fall, although the ceiling void may only allow a fall with a condensate pump.
Related calculators and terms