uPVC drainage pipes in the bill of quantities
| Unit | lin. m (or per point) |
|---|---|
| Category | Soil and waste drainage |
| Division | Plumbing and drainage |
The item as worded in the bill
Supply and install uPVC soil and waste pipes, 110 mm (4 inch) diameter, for horizontal runs and vertical stacks, with solvent-cement joints; the rate includes bends, angled junctions, cleanouts and supports, laying to the specified falls, water testing of the network before covering, and everything necessary to complete the work to the drawings and specification.
Method of measurement
Measured in linear metres along the centre line, each diameter and wall-thickness class separately, without deducting fittings; buried lines are kept apart from suspended and vertical ones where descriptions differ. A stack is measured from the level of its bottom connection to the end of the vent above the roof. Socket engagement at joints and wastage are not counted. Floor drains and inspection chambers have their own items.
What the unit rate covers
- Pipes of the specified diameter and wall class
- Bends, junctions, reducers and cleanouts
- Solvent cement and cleaner, or rubber rings
- Hangers and brackets for suspended and vertical lines
- Water fill test
Priced separately
- Excavation, sand bedding and backfill unless the description includes them
- Inspection chambers and floor drains
- Concrete encasement of lines under driveways
Specification and reference
The network is executed to SBC 701, which sets minimum diameters, falls, cleanout positions and venting requirements. Pipes and fittings are supplied to the Saudi standard for uPVC drainage pipes or to ASTM D2665, in the wall class stated in the project specification, and pipes exposed to the sun are of a UV-resistant type or painted.
What moves the rate
- Diameter and wall-thickness class
- Buried, suspended below the slab or vertical
- Density of fittings and cleanouts
- Excavation depth for external lines
Common pricing mistakes
- Forgetting the vent stack length from the last connection to above the roof, which equals the full building height in multi-storey blocks.
- Pricing the light wall class where the specification demands the heavy class for buried lines, so the delivery is rejected at inspection.
- Using one sharp bend at the foot of the stack instead of two angled bends, then bearing the alteration cost after the engineer’s remark.
- Leaving out galvanised hangers for suspended lines; the required spacing makes their number large in car parks and service floors.
Related calculators and terms
More items in Soil and waste drainage
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل