Fire pump set in the bill of quantities
| Unit | set (or lump sum) |
|---|---|
| Category | Fire fighting |
| Division | HVAC and fire fighting |
The item as worded in the bill
Supply and install listed and approved fire pump set comprising an electric-driven main pump and a diesel-driven standby pump, each rated 750 gpm at 7 bar, and a jockey pump, with a controller for each pump; the rate includes fuel tank, exhaust assembly, batteries, test line, start-up and testing.
Method of measurement
Measured as a complete set, or by number for each pump with its controller, according to rated flow and pressure and pump type (horizontal split case, end suction, vertical turbine). Accessories attached to the pump are carried in the rate; pump-room pipes and valves are measured in linear metres and by number where items exist, otherwise they are deemed within the set as the item wording provides.
What the unit rate covers
- The three pumps with their drivers and steel base frames
- An approved controller for each pump
- Diesel fuel tank, exhaust assembly, batteries and charger
- Pressure relief valve and test line with flow meter
- Gauges, pressure switches and sensing lines
- Start-up and performance test witnessed by the approving party
Priced separately
- Power supply cables to the controllers
- Fire water tank
- Concrete plinths and pump-room ventilation
- Fire pipe network outside the pump room
Specification and reference
Governed by the fire code SBC 801; pumps are selected, installed and tested to NFPA 20, which requires pump, driver and controller to be listed for fire service and does not allow horizontal pumps to work under suction lift. Civil Defense approves the set, and the acceptance test is run at three flow points on the pump curve.
What moves the rate
- Rated flow and pressure
- Pump type (horizontal or vertical turbine)
- Presence of a diesel pump and standby power requirements
- Level of listing required and delivery period
Common pricing mistakes
- Pricing commercial pumps not listed for fire service, which are rejected at approval and replaced by a listed set at a much higher price.
- Selecting a horizontal pump when the fire tank lies below the pump room, a case that needs a costlier, longer-delivery vertical turbine pump.
- Leaving out the diesel pump accessories: fuel tank, exhaust insulation and discharge, dual batteries and pump-room ventilation openings.
- Forgetting the test line with flow meter, the relief valve and the sensing lines, all needed to run the acceptance test.
Related calculators and terms
More items in Fire fighting
Price your whole bill of quantities
Upload the bill of quantities and its items are priced from published references, each with its price source.
Start nowجرّب بلا تسجيل