Defect عيب تنفيذ
Definition
Work not meeting the specification, which the contractor must repair at its own cost before handover or during the defects liability period after it — even if it has already been paid for and the works were ostensibly accepted.
Example
Cracked plaster was repaired within the defects liability period.
Where it is used
Quality and the period after handover.
Related terms
From the term to the work
Etimadco turns these concepts into daily working tools for your projects.
Start free